Henry Drilling logo

Henry Drilling

Community Listed
  • Contractor
  • Operated rental

Golden Ears Rapid Station

Golden Ears, BC

Henry Foundation Drilling Inc. (HFDI) successfully executed the specialized design-build shoring scope for the new Golden Ears Pump Station infrastructure project. Partnering closely with Isherwood Engineering, HFDI co-designed a highly cost-effective, heavy-duty shoring solution engineered to dual-function as a structural support and a high-efficiency water cut-off wall for the site.

up to 80 feet
Sheet pile length
lattice crawler crane configured with 180 feet of boom
Crane

Project Overview & Collaborative Engineering

Henry Foundation Drilling Inc. (HFDI) successfully executed the specialized design-build shoring scope for the new Golden Ears Pump Station infrastructure project. Partnering closely with Isherwood Engineering, HFDI co-designed a highly cost-effective, heavy-duty shoring solution engineered to dual-function as a structural support and a high-efficiency water cut-off wall for the site.

Deep Foundation & Structural Shoring Specifications

To manage the complex geotechnical requirements and hydrologic conditions of the project, a robust system utilizing heavy sheet piles, structural steelwork, and ground anchors was selected.