River District Secant Pile Project

South Vancouver, BC

Henry Foundation Drilling Inc. (HFDI) successfully completed a complex, high-stakes geotechnical project in South Vancouver’s dynamic River District community. Operating under demanding geotechnical constraints, our team delivered industry-leading foundation solutions tailored to difficult urban waterfront conditions.

460 at 900mm diameter
Secant piles
up to 18 meters
Pile depth
2 meters below the ground surface
Water table
330 of the 460 piles
Piles finished with airlift system
100-ton crawler crane
Crane

The solution

The pile toes terminated in a clean sand layer, presenting a severe operational hurdle: extracting casings risked creating suction and disturbing the critical bearing stratum. To overcome this challenge and ensure long-term structural integrity: Specialized Airlift System: HFDI deployed a specialized airlift system to successfully finish 330 of the 460 piles

Secant Pile Foundation Drilling in South Vancouver’s River District

Henry Foundation Drilling Inc. (HFDI) successfully completed a complex, high-stakes geotechnical project in South Vancouver’s dynamic River District community. Operating under demanding geotechnical constraints, our team delivered industry-leading foundation solutions tailored to difficult urban waterfront conditions.

Project Overview & Technical Scope

Engineering Solutions for Complex Ground Conditions

The pile toes terminated in a clean sand layer, presenting a severe operational hurdle: extracting casings risked creating suction and disturbing the critical bearing stratum. To overcome this challenge and ensure long-term structural integrity: