
Golden Ears Rapid Station
Golden Ears, BC
Henry Foundation Drilling Inc. (HFDI) successfully executed the specialized design-build shoring scope for the new Golden Ears Pump Station infrastructure project. Partnering closely with Isherwood Engineering, HFDI co-designed a highly cost-effective, heavy-duty shoring solution engineered to dual-function as a structural support and a high-efficiency water cut-off wall for the site.
- up to 80 feet
- Sheet pile length
- lattice crawler crane configured with 180 feet of boom
- Crane
Project Overview & Collaborative Engineering
Henry Foundation Drilling Inc. (HFDI) successfully executed the specialized design-build shoring scope for the new Golden Ears Pump Station infrastructure project. Partnering closely with Isherwood Engineering, HFDI co-designed a highly cost-effective, heavy-duty shoring solution engineered to dual-function as a structural support and a high-efficiency water cut-off wall for the site.
Deep Foundation & Structural Shoring Specifications
To manage the complex geotechnical requirements and hydrologic conditions of the project, a robust system utilizing heavy sheet piles, structural steelwork, and ground anchors was selected.






