Flap System

0.0
No Rating
Based on 0 reviews

Revitalize your foundation projects with the Olivier flaps system, steering towards CO2-neutral construction. This innovative system replaces lost drill tips, significantly conserving materials and slashing CO2 emissions. It enhances on-site safety by lowering accident risks and ensures precise pile placement. Adaptable to various drilling systems and pile sizes, the Olivier flaps system delivers a sustainable and effective approach to foundational support and soil improvement. The use of the flap system in full displacement screw piling offers benefits far beyond just cost and material savings. Users have noted that this innovative system allows for much more precise positioning of the auger head.

Discover Olivier Newest Products

Product image

Piling Rigs

Olivier DPM Pile
0.0
No Rating
Based on 0 reviews
Product image

Piling Rigs

Displacement head
0.0
No Rating
Based on 0 reviews
Product image

Piling Rigs

Olivier coupling
5.0
Outstanding
Based on 7 reviews
Product image

Piling Rigs

Flap System
0.0
No Rating
Based on 0 reviews

Sizes

The Olivier flaps system comes in three sizes, including an option with a 210mm (8″⁹/₃₂) passage for d31/51 auger heads, a medium variant with a 250mm (9″⁷/₈) passage for auger heads starting at d36/56, and a larger version with a 300mm (11″¹³/₁₆) passage designed for the largest auger heads. This range ensures versatility for different foundation requirements. Moreover, the flaps system, in combination with the auger head for the Olivier pile, significantly reduces concrete usage and prevents soil from being brought to the surface. This offers a substantial economic and ecological advantage within the construction industry.

More benefits

The use of the flap system in full displacement screw piling offers benefits far beyond just cost and material savings. Users have noted that this innovative system allows for much more precise positioning of the auger head. Additionally, there is a significant improvement in safety: the risk of construction site accidents is drastically reduced as there is no longer a need to manually place a lost drill tip under the auger head.

Similar Models

Product image
0.0
No Rating
Based on 0 reviews
Buy Used
Product image
5.0
Outstanding
Based on 1 reviews
Buy Used
Product image
0.0
No Rating
Based on 0 reviews
Buy Used

Get in Touch with the Brand Owner About Flap System Model

First and Last Name
Company
Email
Phone Number
Leave a Message

Why Customers Love Olivier: Reviews & Testimonials

Sort by

green smiley
Is this review helpful?
0
green smiley
Is this review helpful?
0
green smiley
Is this review helpful?
0
Show more reviews (10)